Bethel conducted a supplemental remedial investigation of TCE impacts to groundwater at a former Atlas “D” ICBM launch site at FE Warren AFB, near Cheyenne, WY.
Nome Tank Demolition and Contaminated Soil Removal
Long Term Monitoring and Remedial Action Operations
Mount Santa Rosa Release Investigation
Hazardous Waste Management at Misawa AB, Japan
Burbank Localizer Decommissioning
Bethel was retained by the FAA to remove a localizer platform at the west end of Runway 8 at the Bob Hope International Airport in Burbank, California. The platform was constructed of wood decking, support beams, staircase, hand railings, and supported by subgrade concrete foundations. The wood was partially painted with lead-based paint (LBP).




