Bethel was contracted by the Naval Facilities Engineering Command Southwest (NAVFAC SW) to replace a water main at the Harvey Field, Facility 50117 on the China Lake Naval Air Weapons Station (NAWS) which was damaged during a 7.1 magnitude earthquake.
Bethel was contracted to repair eight aging and failing Sewer Lift Stations at Naval Base Ventura County (NBVC) Port Hueneme (PH) and Point Mugu into fully functional conditions.
Bethel was contracted by the Naval Facilities Engineering Command Southwest (NAVFAC SW) to replace a water main at the Harvey Field, Facility 50117 on the China Lake Naval Air Weapons Station (NAWS) which was damaged during a 7.1 magnitude earthquake.
Bethel was contracted by the United States Air Force to provide and install a complete wastewater treatment plant (WWTP) at Joint Base San Antonio-Camp Bullis (JBSA-Camp Bullis) in San Antonio, Texas.
Bethel was contracted by the City of Bethel to install 7,300 linear feet (LF) of new water main pipeline and provide electrical and mechanical upgrades to the Bethel Subdivision Water Treatment Plant (SWTP) in Bethel, Alaska.
Bethel was contracted by the City of Bethel to inspect and clean the interior and exterior of two potable 426,300 gallon and 500,000 gallon water tanks.